Skip to main content
Loading…
This section is included in your selections.

The material immediately around the pipe shall be carefully compacted to at least six inches above the top of the pipe. In gravel soils, the material above six inches above the pipe may be saturated after seventy-two hours after jointing the pipe so as to decrease the possibility of future settlement.

(Ord. 506 § 5(7), 1954)