Skip to main content
Loading…
This section is included in your selections.

A. Final plans, specifications, profiles for all required public improvements shall be provided in a manner acceptable to the public works director. Improvements shall conform to adopted city standards or other standards specified by the public works director. Plans shall be stamped and signed by a professional engineer licensed and registered in the state of Washington.

B. Survey Certificate. The survey and preparation of final plats shall be made by or under the supervision of a registered land surveyor who shall certify on the final plat that it is a true and accurate representation of the lands actually surveyed. The certification shall include that all required monuments have been set and that all lot corners have been staked on the ground consistent with the final plat. All surveys shall conform to standard practices and principles of land surveying as outlined in Chapter 58.09 RCW.

(Ord. 1235 § 2 (Exh. B), 2005)