Skip to main content
Loading…
This section is included in your selections.

All excavation near the bottom of the trench shall be accomplished in such way as to insure a uniform bedding for pipe. In general, a groove to fit and receive the pipe shall be formed in the bottom of the trench. In unsuitable or soft material, bedding gravel is required.

(Ord. 506 § 5(3), 1954)