Below are fees to be added to the building permit when structures require mechanical and/or plumbing permits. If a mechanical or plumbing permit is purchased separately (meaning an existing building is only changing or adding mechanical or plumbing elements) an hourly inspection fee must be added.

Permit Issuance

$ 60

Furnaces

Forced-air, gravity-type furnace or burner up to and including 100,000 Btu/h

$ 25

Forced-air, gravity-type furnace or burner over 100,000 Btu/h

$ 30

Floor furnace

$ 25

Suspended heater, recessed wall heater or floor-mounted unit heater

$ 25

Appliance Vents

For the installation, relocation or replacement of each appliance vent installed and not included in an appliance permit

$ 15

Repairs or Additions

For the repair of, alteration of, or addition to each heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption, or evaporative cooling system, including installation of controls regulated by the Mechanical Code

$ 25

Boilers, Compressors and Absorption Systems

Boiler or compressor to and including 3hp or each absorption system to and including 100,000 Btu/h

$ 25

Boiler or compressor over 3hp to and including 15hp or each absorption system over 100,000 Btu/h to and including 500,000 Btu/h

$ 40

Boiler or compressor over 15hp to and including 30hp or each absorption system over 500,000 Btu/h to and including 1,000,000 Btu/h

$ 60

Boiler or compressor over 30hp to and including 50hp or each absorption system over 1,000,000 Btu/h to and including 1,750,000 Btu/h

$ 90

Boiler or compressor over 50hp or each absorption system over 1,750,000 Btu/h

$ 150

Air Handlers

Air handling unit up to and including 10,000 cfm

$ 25

Air handling unit over 10,000 cfm

$ 30

Evaporative Cooler

For each evaporative cooler other than portable type

$ 25

Ventilation and Exhaust

Ventilation fan connected to a single duct (each)

$ 15

Ventilation system which is not a portion of any heating or air-conditioning system

$ 25

Hood, which is served by mechanical exhaust, including the ducts for such hood

$ 25

Incinerators

For the installation or relocation of each domestic-type incinerator

$ 30

For the installation or relocation of each commercial or industrial-type incinerator

$ 25

Miscellaneous

For each appliance or piece of equipment regulated by the Mechanical Code but not classed in other appliance categories, or for which no other fee is listed in the table

$ 25

Each plumbing fixture on one trap or a set of fixtures on one trap

$ 15

Each hot water heater

$ 15

Orifice change outs (each)

$ 15

Gas piping system of one to five outlets

$ 15

Additional gas piping system outlet (each)

$ 10

LP gas storage tank 1 to 1,000 gallons

$ 70

LP gas storage tank over 1,000 gallons

$ 150

Inspection fee for which no fee is specifically indicated

$ 110

(Res. 2023-013 § 1 (Exh. A), 2023)